Home
 
 
grin_bear
01 June 2009 @ 08:43 pm
Got some more paint scraping done in the upper stairwell. I did the top half of the door -- it looks like it was made to go there hehe. The blue line to the right is to protect the previously-bared wood when the second coat of yellow paint is put on the walls.



Once it is completely scraped, I can pull it out of the doorway and scrape the right-hand edge, then laminate more wood onto that so that the door can be made to exactly fit this doorway. That will make it possible to mount it on its hinges instead of having it held in with wedges. One time there was a terrific gust of wind and it popped the door off the wedges so it came crashing down. Boy did that make us all jump :D



The window that had been partially scraped before is now completely scraped. It looks great! The following day, I also washed all the Zip Strip gack off the glass and for the first time in weeks you could see through the window really well. Progress has been made! w00T!

 
 
Current Mood: accomplished
Current Music: podcast: Stuff you Missed in History Class